Project Details

 

Project Developer (Proponent)
Project Name: Perflurocarbon's Emissions Reduction
Organization Name: The Aluminum Company of Egypt
Organizational Category: Public
Organization Address: 55 Abdel –Khalek Sarwat Street, Cairo
Contact Person: Eng. Said Abd El-Wahab Chairman & CEO
Phone: + 202 5744295
Fax: + 2096 6588195
Email: plants@egyptalum.com.eg
Website:  
 

Type of Project

Project Category: Industry
GHGs: PFCs & CO2
 

Certified Emission Reductions (CERs)

Crediting Period:

3x7 years

First Year of Crediting Period:

2007

Annual CERs Expected:

185742
 

Project Description

Brief Description of project: Egyptalum has started operation since 1975. The primary aluminum plant consists of 6 pot lines each line contains 93 electrolytic cells. Lines No. 5 & 6, with a total 186 electrolytic cells are point feeder prebake type (CWPP) and the other four lines No. 1,2,3&4 with a total 372 electrolytic cells are vertical stud sederberg type (VSS). The total aluminum production in 2005 was 238,000 tons/year. Brief description of technology: The project will implement the best available proven technology to reduce emissions of GHGs through reducing the time of cell upset (anode effect). It is proposed to install a new algorithm to avoid/minimize what is called “Anode Effect”. During the aluminum smelting process perfluorocarbons (PFCs), tetrafluoromethane (CF4) and hexafluroethan(C2F6) are produced during brief process upset periods, anode effect. In addition Carbon Dioxide CO2 is emitted from anodes consumption.

 

Project Location

Governorate:

Qena

City:

Naga Hammadi
 

Project Schedule & Cost

Project Start Date: 2007
Project Cost: undefined
 

Baseline

Baseline:

Title of the baseline: NM0124 – REV PFCs emission reduction at Aluar Alumina Argentino (methodology is under consideration)
 

Project Current Status

PIN: Available
PDD:  
DNA Approval: In process
Validation: Not yet
Financing:  
Implementation: Not yet

 

 

 

 

 
ÑãÒ äÞØí

Home

ÑãÒ äÞØí

Events & Workshops

ÑãÒ äÞØí

Publications

ÑãÒ äÞØí

CDM Project Portfolio

ÑãÒ äÞØí

Project Approval Procedure

ÑãÒ äÞØí

Questions & Answers

ÑãÒ äÞØí

CDM National Strategy

ÑãÒ äÞØí

Projects Ideas

ÑãÒ äÞØí

Projects Database

 

 

 

Copyright © 2004 www.cdmegypt.org All Rights Reserved - Last updated: Tuesday, 25 July 2006