|
Brief
Description of project: The project aims at switching steam and oil
boilers operating on heavy oil and light oil respectively to natural
gas. The capacities of the boilers are as follows: • Steam boilers:
seven 12 ton/hr boilers and eleven 8 ton/hr boilers • Oil Boilers: two
600,000 kcal/hr boilers and two 229,952 kcal/hr boilers The project
involves the installation of internal and out of fence NG network,
natural gas-based burners and automatic control system for the burners.
Brief description of technology: Fuel switching |